Yes—if the asbestos floor tiles are intact, stable, and allowed by your local code, the safest DIY approach is to leave them in place and encapsulate them with a new floor. The best options are floating floors like rigid-core vinyl plank (LVP/LVT) or laminate, or loose-lay sheet vinyl. Avoid sanding, scraping, or drilling into the tiles.

Why encapsulation is the safe route

Asbestos floor tiles (commonly 9x9, 12x12, or older vinyl-composition tiles) are considered non-friable when intact. The hazard rises when fibers become airborne—usually from sanding, grinding, or demolition. Encapsulation seals the old surface and avoids disturbing it. Removal is possible but often requires licensed abatement and can be costly.

Always check local regulations and the new flooring manufacturer’s installation guide. If you don’t know whether your tiles contain asbestos, have them tested by a certified lab before proceeding.

Good flooring choices over asbestos tile

  • Floating LVP/LVT with rigid core (SPC or WPC): Resists telegraphing minor seams; click-lock makes it DIY-friendly.
  • Laminate flooring: Also a floating system; ensure moisture control on slabs.
  • Loose-lay sheet vinyl: Can sit over the old floor with perimeter adhesive (follow manufacturer instructions).

Avoid nail-down flooring or anything requiring fasteners through the tile. Glue-down products are possible, but you must use compatible adhesives and avoid any surface prep that abrades the tile.

Tools and materials

  • PPE: Work gloves, safety glasses; P100 respirator if you end up handling any loose debris; disposable coveralls for dusty spaces
  • Cleaning: HEPA vacuum, microfiber mop, TSP substitute/degreaser
  • Subfloor prep: 6–10 ft straightedge/level, cementitious patch/feather finish (e.g., Ardex Feather Finish/Henry 549), flat trowel, primer if required by patch manufacturer
  • Moisture/mitigation: 6-mil poly vapor barrier (over concrete for floating floors), moisture meter or RH/MVER test kits (for concrete slabs)
  • Installation: Utility knife, tape measure, spacers, tapping block, pull bar, rubber mallet, oscillating multi-tool or jamb saw to undercut door trim, transition strips, quarter-round/shoe molding, construction adhesive and brad nails for trim only (into walls/baseboards, not the tile)

Prep steps (don’t skip these)

  1. Inspect and comply:
    • If tiles are crumbling, delaminating, or multiple tiles are loose, stop and call an abatement pro.
    • Verify local code and the new floor manufacturer permit installation over existing resilient/asbestos tiles.
  2. Clean the surface:
    • HEPA vacuum and damp-mop with a mild degreaser. Avoid aggressive scrubbing or abrasive pads.
  3. Check flatness and moisture:
    • Use a long straightedge to mark high/low spots.
    • On concrete slabs, perform a moisture check. For DIY, a taped plastic sheet test gives a clue; for accurate results, use RH probes or a calcium chloride test per the new flooring specs.
  4. Smooth minor seams:
    • If tile seams or slight divots could telegraph, skim with a compatible cementitious feather finish. Apply thinly with a flat trowel. Do not grind or sand the old tile. Follow cure times.
Typical specs to meet (confirm with your flooring brand):
- Flatness (floating LVP/laminate): 3/16 inch over 10 feet (or 1/8 inch over 6 feet)
- Expansion gap: 1/4 inch at all fixed walls and vertical obstructions
- Concrete RH: ≤ 85–95% (product-dependent)
- MVER: 3–8 lbs/1000 sq ft/24 hr (product-dependent)

Installation methods

Floating LVP/LVT or laminate (recommended)

  1. Acclimate planks as directed by the manufacturer.
  2. Over wood subfloors: Underlayment may be built-in or separate; follow brand guidance.
  3. Over concrete: Lay 6-mil poly as a continuous vapor barrier with taped seams, then underlayment if needed.
  4. Plan layout: Dry-fit the first two rows, stagger end joints (typically ≥ 6–8 inches). Avoid slivers along the last row by balancing the layout.
  5. Click and lock: Start along the longest, straightest wall. Use spacers for a 1/4-inch perimeter gap. Tap planks with a block and use a pull bar near walls.
  6. Undercut door jambs with an oscillating tool for a clean look. Slide planks under rather than notching tightly.
  7. Finish with transitions and trim: Cover perimeter gaps with quarter-round fixed to baseboards, not the floor. Do not nail into the asbestos tile.

Time: A 150–200 sq ft room typically takes a day for a careful DIYer. Cost: $2–$5/sq ft for rigid-core vinyl or laminate, $0.25–$0.75/sq ft for underlayment, plus $20–$50 for trims and transitions.

Loose-lay sheet vinyl

  • After cleaning and skimming seams, dry-fit the sheet with generous overlap at edges.
  • Use perimeter adhesive if specified by the manufacturer. Roll with a 75–100 lb floor roller if required.
  • This can be fast and budget-friendly, but requires precise cutting around obstacles.

Safety and legal considerations

  • Do not sand, grind, scrape, or bead-blast asbestos tiles or black cutback adhesive.
  • Avoid drilling or nailing through the tiles; fasten trims to walls/baseboards instead.
  • Keep the area damp (lightly) if you must remove incidental debris; HEPA vacuum afterward.
  • If testing confirms asbestos, keep paperwork; some jurisdictions require disclosure or permits for floor work.

Tips for best results

  • Choose rigid-core LVP to minimize telegraphing of minor tile seams.
  • Address height transitions early; use reducers where the new floor meets adjacent rooms.
  • Undercut door casings for a cleaner finish instead of tight scribing.
  • Maintain room temperature/humidity per manufacturer before, during, and after install.

Common mistakes to avoid

  • Prying up loose tiles yourself—this can turn a simple job into an abatement project.
  • Skipping moisture control on concrete slabs.
  • Ignoring flatness; floating floors need a reasonably flat substrate to avoid bounce and joint stress.
  • Fastening thresholds or cabinets through the old tile.

When to call a professional

  • Tiles are brittle, broken, or coming loose in several areas.
  • You plan to remove the old floor or need to grind high spots.
  • Commercial spaces or jurisdictions that require licensed abatement oversight.
  • You need certified moisture testing or warranty-backed installation on a high-value project.

By keeping the old asbestos tile undisturbed and using modern floating or loose-lay systems, you can achieve a safe, durable upgrade with minimal risk and cost, often in a single weekend.